A HOME is Built With LOVE and DREAMS

January 9, 2009

Plaster inside, roofing, new water & electricity point

Filed under: Uncategorized

The extended wet kitchen area dah plaster inside :)

Hey! There are lots of signboards saying TESCO Semenyih is opening in January 09…this month la!? wuhhuuuu…

Tomorrow insyaAllah will go and confirm tiles for wall, floor, table top (wet kitchen) and confirm the grill design n color..hmmm

Comments »

The URI to TrackBack this entry is: http://maiartdecor.blogsome.com/2009/01/09/plaster-inside-roofing-new-water-electricity-point/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>



Anti-spam measure: please retype the above text into the box provided.






















Get free blog up and running in minutes with Blogsome
Theme designed by Riosoft